Skip to content
Contact us
Literature

Gas consumption cut in half with the use of aerothermal gas heat pumps

Municipality Hvidrove

Gas consumption cut in half with the use of aerothermal gas heat pumps

The site Multihuset is a multirole property with offices, canteen and warehouse/storage, and it also houses sections of Hvidovre municipality.

The installation is composed of two natural gas heat pumps, one backup gas boiler and seven decentralized electric water heaters for sanitary water supply. The GHPs are also combined with a large heat storage tank for increased usage.

GHP nearly halves annual gas consumption by replacing the two old and outdated gas boilers at Multihuset with two new GHPs among other improvements, Hvidovre municipality nearly halves Multihuset’s annual gas consumption.

The untraditional solution with installation of GHPs was promoted by HMN Gas Distribution, who in return uses it as a demonstration plant to further promote GHP solutions. The whole system has a payback time of 4½ years, and the GHPs achieved a measured net efficiency of 133 %.

Energy efficiency improvement of public building from the sixteenth century

Energy efficiency improvement of public building from the sixteenth century
  • Customer Calitri Municipal Building
  • Products GAHP GS
  • Application Public buildings

Gas consumption cut in half with the use of aerothermal gas heat pumps

Gas consumption cut in half with the use of aerothermal gas heat pumps
  • Customer Municipality Hvidrove
  • Products GAHP A
  • Application Public buildings

Gas air conditioning for international offices

Gas air conditioning for international offices
  • Customer New York Department of Sanitation
  • Products GA ACF TK, Link Preassembled group
  • Application Public buildings

Retrofit with radiators in the harsh climate of Flanders

Retrofit with radiators in the harsh climate of Flanders
  • Customer Administrative centre Zwevegem
  • Products GAHP A, Link Preassembled group
  • Application Public buildings

Payback of only 4 years for hospital with gas-fired heat pump system

Payback of only 4 years for hospital with gas-fired heat pump system
  • Customer GGz Breburg Medical Center
  • Products GAHP A, Link Preassembled group
  • Application Public buildings

Aerothermal gas heat pumps to heat a hospital facility

Aerothermal gas heat pumps to heat a hospital facility
  • Customer Hospital in Boskovice
  • Products GAHP A
  • Application Public buildings

Energy retrofit in public building of 7 floors covering more than 4000 sqm

Energy retrofit in public building of 7 floors covering more than 4000 sqm
  • Customer Zagreb Chamber of Commerce
  • Products GAHP AR, GA ACF TK
  • Application Public buildings

Innovative choice of the Municipality of Milan: 24% savings, reduction of polluting emissions and high efficiency all year round

Innovative choice of the Municipality of Milan: 24% savings, reduction of polluting emissions and high efficiency all year round
  • Customer Municipality in Milan
  • Products GAHP AR
  • Application Public buildings